# How to plan what goes out and when



Below the cards on a project's **Overview** is a vertical date spine, where you plan what goes
out and when before any of it is work. When a plan is ready to start, you **promote** it and
it becomes a real task with its sub-tasks already filled in. Start at
<Ref to="projects/start-a-project" /> if you have no project yet.

## Before you start [#before-you-start]

Adding and editing plans is open to every member by default, and you can always edit your
own. Promoting a plan into a task, and deleting somebody else's plan, is usually a lead's
job.

**Each team names this thing itself.** One department calls a plan an Editorial, another a
Prep, another a Visit. The word you see comes from that team's setting, described in
<Ref to="workspace-admin/departments" />, so what this page calls a planned item will read as
your own word on screen.

## Why plan separately from tasks? [#why-plan-separately-from-tasks]

Because a plan is a decision about what and when, and a task is a job with an owner. Turning
every idea into a task immediately fills somebody's list with work that has not been agreed.

Fairgreen plans the Autumn drop as fifteen entries on a spine: two lookbook posts, four
emails, a launch video, a set of store visits. Most weeks, half of them move.

Moving a plan is dragging it to another day. Moving fifteen tasks with assignees and dates is
an afternoon.

## How do you add a plan? [#how-do-you-add-a-plan]

Hover the spine on the day you want and use the &#x2A;*+**, or hover any day on the project's
**Calendar*&#x2A; tab and use the &#x2A;*+** there.

Each entry has a title, an optional write-up, a target date and one or more **sub-task type**
tags. Those tags are what become sub-tasks when the plan is promoted.

The tags on offer are the ones an admin has given to this project's department. A department
with none assigned gets an empty picker, which is a settings job rather than a fault. See
<Ref to="workspace-admin/sub-task-types" />.

## How is the spine laid out? [#how-is-the-spine-laid-out]

Entries group into **Upcoming**, **Unscheduled** and **Past**, with past collapsed behind a
count so it does not dominate.

The toggle at the top switches between **With items** and **All days**, and it remembers your
choice. **All days** is the one to use when you are looking for gaps rather than reading what
is already there.

Drag an entry to another day to move it, or drop it on **Unscheduled** to take the date off.

A long write-up collapses behind **Show more**.

## How do you turn a plan into work? [#how-do-you-turn-a-plan-into-work]

Press **Promote**. A dialog opens with the plan's title and write-up already in it, where you
set the task's status, assignee, priority and due date exactly as you would for any task.

Underneath, one sub-task row appears per type tag, pre-filled from that department's
templates. Each row can be renamed, given its own assignee, priority and date, or unticked so
it is not created.

You can add custom sub-task rows too, up to twenty in total.

If the promoted task should repeat, turn that on here as well, per
<Ref to="tasks/make-a-task-repeat" />.

Promote once. After that the button is gone, and the plan carries a chip linking to the task
it became. If the task is later archived, the chip shows it struck through and marked
archived rather than going quiet.

## What happens to the plan afterwards? [#what-happens-to-the-plan-afterwards]

It stays on the **Overview** with its link to the task. It drops off the project **Calendar**,
because the task it became is already on the grid and showing both would double it.

## How do you get a document created automatically? [#how-do-you-get-a-document-created-automatically]

Turn on **Create a document when promoted to a task** on the entry. When you promote it, a
linked document is created alongside the task.

This is how a blog post or a shoot brief arrives with somewhere to write it, rather than
somebody making a document by hand and hoping it gets linked. See <Ref to="documents" />.

If the document cannot be created for any reason, the task is still created and you add the
document yourself. The work is never blocked on the write-up.